(VA) Steve's Build frame: Wicked Willy's big tubing frame
45 degree rake in neck
6" stretch in down tubes
5" stretch in back bone
sheet metal: Wicked Willy's gas and oil tanks motor: HD shovel head tranny:HD four speed front end: Wicked Willy's wide glide springer back tire:300 series
|
First we machine parts for the
frame.
Willy machining axle hangers.
Next, Willy machines the neck for the frame.
Willy bending tubing for the frame
After tubing is bent, Willy hand fits each piece. Here, Willy is cutting fish mouths on each piece of tubing to go in the jig.
Willy checks his cuts in the tubing to be fitted in the frame jig.
After all the tubing is fitted and tacked in place, Willy begins the weld of each joint.
After the frame is welded
and has cooled off, Willy takes it from the jig and checks all the
welds.
Finished frame ready for
clean up
After
Willy and the boys have filled and ground the welds the frame is
set to Willy's personal polisher for blending in
The welds after
polishing
After polishing, Willy
sprays a light primer coat to protect frame from rusting
Next ... Willy
sits the shovel head in to check fit all looks good
Willy is
checking how to fab one of his custom top motor
mounts on this shovel build
ok, so this page is getting huge...click here for the rest of this build.....
Click here to email us at wayne@wickedwillychoppers.com or call us at 828-632-5110 or toll free 1-866-519-4559. We are located at 95 2nd Avenue N.E., Taylorsville, NC, 28681 |
|||
Home | Meet Our Staff |
Products | Request a Quote
| Contact | Order a
T-Shirt | Events | Photo
Gallery | A Build in Progress
Catalog Parts |
Raw
Builder Parts |
Monthly Parts Specials